• ItalianoItaliano
  • EnglishEnglish
ECST Network
  • HOME
  • WHO WE ARE
    • History
    • Organization chart
    • Team
  • OUR CLIENTS
    • Public clients
    • Private clients
  • RECRUITMENT
  • CONTACTS
Select Page

RSS Engineering news

  • R1.4bn Mercury BESS project scheduled to enter into operation in Q4 2027 April 20, 2026
    Independent power producer Mulilo reports that construction of its R1.4-billion Mercury Battery Energy Storage System (BESS) project will begin soon and that the facility is scheduled to enter into commercial operation in the fourth quarter of 2027. The 76 MW/304 MWh project is the first of five projects awarded to Mulilo during Bid Window 2 […]
  • Second tunnel drilling machine excavating 38 km Polihali water transfer tunnel April 20, 2026
    A second tunnel boring machine (TBM) is steadily drilling its way through the 38.5-km-long tunnel connecting Polihali and Katse dams, in the Maluti mountains, as the Lesotho Highlands Water Project (LHWP) Phase 2 continues. The Polihali transfer tunnel, a gravity tunnel that will carry water from the Polihali reservoir to the Katse reservoir, is now […]
  • To tap into tourism potential, South Africa must address airport, visa bottlenecks – Mavuso April 20, 2026
    To seize the opportunity for boosting growth and development presented by tourism, South Africa must address airport capacity constraints, particularly at the OR Tambo International Airport, in Gauteng, that create bottlenecks during peak period. Further, while visa processing has improved, it remains slower than in competing destinations, says business organisation Business Leadership South Africa (BLSA) […]
  • Linkedin
  • Facebook
  • Instagram
© 2022 ECST Network - Studio di Ingegneria Integrata - All rights reserved